Notices

Showing 1-1 of 1 Results for May 2025

View All
  • Stecks Road Reconstruction Project

    Posted:

    We have been informed by American Ashpalt that the reconstruction project of Stecks Road may begin with the pulverizing of the current surface as early as May 8th or 9th.  This project includes removal of approx 10 trees that are in current right-of-way; pulverizing current surface and blending it with additional base material to a depth of approx 8"; replacing two culverts under the road and possible addition of 2 driveway culverts; new ashpalt to be laid in two lifts to a width of 20'; materials added for 2' shoulders.  Please be aware of work being done and use caution if…

    View Notice